πŸ‡ͺπŸ‡¬ Egypt  Β·  πŸ‡ΈπŸ‡¦ KSA  Β·  πŸ‡±πŸ‡Ύ LibyaBuilding since 1993
Current, for construction supply
Home  /  Projects  /  Touristic Villas Compound
Residential Β· Resort

Touristic Villas Compound

Thirty standalone villas at the Galala resort, built from the ground up. We took it from earthworks and soil improvement all the way to turnkey handover.

Touristic Villas

Scope

We built thirty standalone villas at Al Galala on the Red Sea for the Egyptian Army, as a full EPC turnkey package over 2016–2017. The job started at ground level. We did the earthworks and improved the soil across the remote resort plateau, then poured the concrete structures for every unit.

After the structures were up, we carried the villas through external and internal finishings, insulations and the full MEP works. We finished with landscaping across the compound and handed everything over turnkey. The hard part was the location. It sits far from the usual supply lines, so getting thirty finished units to the same standard came down to tight logistics and doing every villa the same way, from the first cut to the last planting.

Challenge

Build thirty villas to the same standard in a remote Red Sea resort, starting on unimproved ground with few local suppliers to draw on.

Solution

One EPC turnkey delivery. Soil improvement, concrete structures, finishings, insulations and MEP, all run the same way across every unit.

Result

All 30 villas finished, landscaped and handed over turnkey inside the 2016–2017 programme.

πŸ’¬
πŸ“žCall πŸ’¬WhatsApp πŸ“Quote