Industrial Β· In progress

EMC 8

Under construction now: a 300-ton steel structure across three floors and close to 8,000 mΒ². The top floor is a full free span, no columns.

EMC 8 industrial facility under construction in 6th of October City

Scope

EMC 8 is a full EPC turnkey job for Elite Merchandising Company in the Industrial Area of 6th of October City. It's a three-floor industrial building of roughly 8,000 mΒ², carried on a 300-ton steel structure and built for fabric-industry manufacturing. We started on site in 2025 and are working toward completion in 2026. Current handles the engineering, the procurement and the construction.

The top floor is the hard part. It's a complete free span: no internal columns, nothing in the way, just open production space the owner can lay out however they want. Getting a clear span that size on the top level of a multi-storey steel building takes careful structural design and a disciplined erection sequence. That's the kind of steel and multi-storey industrial work we do.

Challenge

Build a three-floor, ~8,000 mΒ² manufacturing facility with a top floor that stays completely column-free, all on a working industrial site.

Solution

A 300-ton steel structure with long-span framing on the upper level, run under a single EPC turnkey contract that covers design through erection.

Result

A fabric-industry facility going up on schedule for 2026, with a free-span top floor that lets the owner set out production lines any way they need.